| project name | The owner | Date of contract |
| Construction works of sidewalks and basements for the inner and outer corridors of the plan located in the Cordoba district | Abdul Rahman Bin Salman Al Halafy Real Estate Office | 3/5/2005 |
| Planned block settlement 3250 Córdoba district | Abdul Rahman Bin Salman Al Halafy Real Estate Office | 3/5/2005 |
| Sidewalks for pedestrian walkways and public park corridors as planned ( 3224) – Jasmine hill diagram | Future plans company for real estate development and investment | 17/5/2005 |
| The construction of tiles and sidewalks in the corridors and streets located in the Rimal neighborhood is planned ( 3270 ) | Al Sultan Office for Real Estate Development and Investment | 11/2/2006 |
| Building tiles and sidewalks, corridors and streets located in the project in Al-Nazim district, Al-Safwa scheme ( 3247 ) | Sheikh Hamad Al Qasim Real Estate Office | 4/4/2006 |
| Removing the accumulated sand in the ventilation and drainage holes and the valve line of the stations for Riyadh water transmission line A. / B | Rashid Al Ajeeban Contracting Company Ltd. | 13/9/2006 |
| Building tiles and sidewalks in the corridors and streets in the Seville neighborhood is planned ( 3178 ) | Sheikh Abdul Rahman Al-Sahim Real Estate Office | 4/6/2007 |
| Building tiles and sidewalks, corridors and streets located in the Jasmine neighborhood project | Sheikh Abdul Rahman bin Abdullah Al Hillel Real Estate Office | 23/7/2007 |
| Create gates and traps for animals at a kilo 72 والكيلو 75 On-line ( ps3) Pipeline Contract No. ( 388/3400) | Saline Water Desalination Corporation | 11/2/2008 |
| Restoration work and repair of toilets and kitchens in the entertainment center, sports center, mosque, and maintenance office in the residential complex of the line (htp) Pipelines (396/3400) | Saline Water Conversion Corporation | 18/2/2008 |
| Asphalting works for small parking lots, trucks, and housing entrances at the upper point of pipelines | Saline Water Desalination Corporation | 20/2/2008 |
| Asphalting the streets surrounding its warehouse in the Al-Selay neighborhood | Sons of Abdullah Al-Ali Al-Minejam Company | 27/2/2008 |
| Filling the exposed pipes and covering them with lime mud for different locations of the Riyadh water transmission line, Contract No. (381/3400) | Saline Water Desalination Corporation | 18/3/2008 |
| Cutting, filling, asphalt removal, rebar and interlock works | United Maintenance and Contracting Company | 3/5/2008 |
| Manufacture and installation of turnkey offices for point station (477/3400) | Saline Water Conversion Corporation | 1/6/2008 |
| Filling two exposed pipes with sand and lime mud and re-installing indicators in different locations of the Riyadh water line Contract No. (401/3400) | Saline Water Conversion Corporation | 4/6/2008 |
| Repairs to station entrance and interior parking at the upper point of pipelines | Saline Water Desalination Corporation | 30/8/2008 |
| Excavation and extension works for a water network, rain drainage and plumbing for the site of Al-Fanar Industrial City, Contract No. ( cd 77 -022) | Al-Fanar Company | 11/11/2008 |
| Construction of roads in Wadi Hanifa | United Maintenance and Contracting Company(UNIMAC) | 1/12/2008 |
| Skimming and asphalting the back area of the reinforcing steel and metalwork manufacturers | Al-Muhaidib Metal Industries Company | 3/12/2008 |
| Asphalting works for the facilities of Al Fanar Industrial City, Contract No. (cd 77-020 ) | Al-Fanar Company | 20/1/2009 |
| Building tiles and sidewalks in the corridors and streets located in the Jasmine neighborhood, Princess Moudi bint Khaled's scheme (3236) | Mada Group for Industrial and Commercial Investment | 21/1/2009 |
| Asphalting works for Hateen power station | Al-Fanar Company | 28/3/2009 |
| Waste removal project in the second industrial city in Riyadh | Body industrial cities and technology zones | 29/3/2009 |
| Asphalting project and repairing asphalt cracks and making curbstones for the industrial city streets in Riyadh | Body industrial cities and technology zones | 29/4/2009 |
| The expansion of the optical fiber network | Nahi Contracting Company | 1/5/2009 |
| Entrance and exit hatch and expansion path in the Northern Ring | Mahd Hospitality Company | 23/5/2009 |
| The project of repairing industrial cracks, potholes and bumps of roads in the Industrial City of Riyadh | Body industrial cities and technology zones | 1/8/2009 |
| The project of implementing cleaning works for the residential area located in the industrial city of Riyadh | Body industrial cities and technology zones | 13/1/2010 |
| Asphalting and earthworks within the Fanar Industrial City power station, Contract No. 77-034 ) cd ) | Al-Fanar Company | 7/2/2010 |
| Executing some rehabilitation work, for example, but not limited to:Fencing and asphalting the police roundabout in the Second Industrial City in Riyadh and another | Industrial Estates Authority | 2/5/2010 |
| Pipe installation work (pvc) Diameter 8 inch | Saline Water Conversion Corporation | 16/5/2010 |
| Road works in the facilities of Fanar Industrial City, Contract No. ( cd77-042) | Al-Fanar Company | 2/11/2010 |
| Drilling and disposal of drilling materials at the King Abdullah Financial District site ( Hold number 13305 ) | bin Ladin Saudi group | 21/11/2010 |
| Road and asphalt works at King Saud University in Riyadh | bin Ladin Saudi group | 2/1/2011 |
| Earthworks project for Azizia land, old Kharj road | Al-Fanar Company | 12/2/2011 |
| Road cutting, leveling and transfer of waste at the King Abdullah Financial District site | bin Ladin Saudi group | 21/4/2011 |
| Road cutting, leveling, and waste transfer work at King Abdullah Financial District, Contract No. (13716 ) | bin Ladin Saudi group | 16/11/2011 |
| Digging works at King Abdullah Financial District, Contract No. ( 13755 ) | bin Ladin Saudi group | 5/12/2011 |
| Road works inside Al-Muhaidib land in Al-Sally neighborhood – Riyadh | Abdul Qadir Al Muhaidib and Sons Company | 31/12/2011 |
| Submit the classification and settlement of the substation for the power station project No. (12)The United League in Riyadh (Darma) | Bimco Arabia Contracting Company | 10/11/2012 |
| Excavation and filling works in the Al-Malqa project | Ram Al-Mabani Contracting Company Ltd. | 24/4/2013 |
| Filling works, SB layer, base layer material change, and SB layer in all works for North Riyadh Street asphalt project | Roads Summit Contracting Est | 10/9/2013 |
| Drilling works for the flood drainage project | Tributaries Roads Contracting Est | 11/9/2013 |
| Earthworks projects and hall No. (5) At King Khalid International Airport | Elarrab Contracting Company | 15/2/2014 |
| Earthworks for the asphalting project, south of Riyadh | Al-Fawzani Company | 10/4/2014 |
| Drilling works for the flood drainage project in southern Riyadh | Al Namal Holding Company | 23/4/2014 |
| Extension and expansion of the optical fiber network | Etihad Mobily Communications Company |