Project Description:
-Rehabilitation and reconstruction of chlorine field pipes (PVC) Diameter 8 inch.
-Making repairs to the entrance to the station and the internal approvals at the top point of the pipelines.
-Restoration and repair work in the entertainment center, sports center, mosque and maintenance office in the residential complex of the line (HPT) Pipelines(396/3400 ).
-Fixing the station entrance and internal parking at the top point of the pipelines ( 481/3400 ).
-Asphalting of parking lots for small cars and trucks and the entrance to the residence in the upper area with pipelines (544/3400 ).
-Backfilling of the swamp water drainage emergency tank No 2 at the upper point (499/3400).
-Manufacture and installation of turnkey offices for point station ( 447/3400 ).