project name |
The owner |
Date of contract |
Construction works of sidewalks and basements for the inner and outer corridors of the plan located in the Cordoba district |
Abdul Rahman Bin Salman Al Halafy Real Estate Office |
3/5/2005 |
Planned block settlement 3250 Córdoba district |
Abdul Rahman Bin Salman Al Halafy Real Estate Office |
3/5/2005 |
Sidewalks for pedestrian walkways and public park corridors as planned ( 3224) – Jasmine hill diagram |
Future plans company for real estate development and investment |
17/5/2005 |
The construction of tiles and sidewalks in the corridors and streets located in the Rimal neighborhood is planned ( 3270 ) |
Al Sultan Office for Real Estate Development and Investment |
11/2/2006 |
Building tiles and sidewalks, corridors and streets located in the project in Al-Nazim district, Al-Safwa scheme ( 3247 ) |
Sheikh Hamad Al Qasim Real Estate Office |
4/4/2006 |
Removing the accumulated sand in the ventilation and drainage holes and the valve line of the stations for Riyadh water transmission line A. / B |
Rashid Al Ajeeban Contracting Company Ltd. |
13/9/2006 |
Building tiles and sidewalks in the corridors and streets in the Seville neighborhood is planned ( 3178 ) |
Sheikh Abdul Rahman Al-Sahim Real Estate Office |
4/6/2007 |
Building tiles and sidewalks, corridors and streets located in the Jasmine neighborhood project |
Sheikh Abdul Rahman bin Abdullah Al Hillel Real Estate Office |
23/7/2007 |
Create gates and traps for animals at a kilo 72 والكيلو 75 On-line ( ps3) Pipeline Contract No. ( 388/3400) |
Saline Water Desalination Corporation |
11/2/2008 |
Restoration work and repair of toilets and kitchens in the entertainment center, sports center, mosque, and maintenance office in the residential complex of the line (htp) Pipelines (396/3400) |
Saline Water Conversion Corporation |
18/2/2008 |
Asphalting works for small parking lots, trucks, and housing entrances at the upper point of pipelines |
Saline Water Desalination Corporation |
20/2/2008 |
Asphalting the streets surrounding its warehouse in the Al-Selay neighborhood |
Sons of Abdullah Al-Ali Al-Minejam Company |
27/2/2008 |
Filling the exposed pipes and covering them with lime mud for different locations of the Riyadh water transmission line, Contract No. (381/3400) |
Saline Water Desalination Corporation |
18/3/2008 |
Cutting, filling, asphalt removal, rebar and interlock works |
United Maintenance and Contracting Company |
3/5/2008 |
Manufacture and installation of turnkey offices for point station (477/3400) |
Saline Water Conversion Corporation |
1/6/2008 |
|
|
|
Filling two exposed pipes with sand and lime mud and re-installing indicators in different locations of the Riyadh water line Contract No. (401/3400) |
Saline Water Conversion Corporation |
4/6/2008 |
Repairs to station entrance and interior parking at the upper point of pipelines |
Saline Water Desalination Corporation |
30/8/2008 |
Excavation and extension works for a water network, rain drainage and plumbing for the site of Al-Fanar Industrial City, Contract No. ( cd 77 -022) |
Al-Fanar Company |
11/11/2008 |
Construction of roads in Wadi Hanifa |
United Maintenance and Contracting Company(UNIMAC) |
1/12/2008 |
Skimming and asphalting the back area of the reinforcing steel and metalwork manufacturers |
Al-Muhaidib Metal Industries Company |
3/12/2008 |
Asphalting works for the facilities of Al Fanar Industrial City, Contract No. (cd 77-020 ) |
Al-Fanar Company |
20/1/2009 |
Building tiles and sidewalks in the corridors and streets located in the Jasmine neighborhood, Princess Moudi bint Khaled's scheme (3236) |
Mada Group for Industrial and Commercial Investment |
21/1/2009 |
Asphalting works for Hateen power station |
Al-Fanar Company |
28/3/2009 |
Waste removal project in the second industrial city in Riyadh |
Body industrial cities and technology zones |
29/3/2009 |
Asphalting project and repairing asphalt cracks and making curbstones for the industrial city streets in Riyadh |
Body industrial cities and technology zones |
29/4/2009 |
The expansion of the optical fiber network |
Nahi Contracting Company |
1/5/2009 |
Entrance and exit hatch and expansion path in the Northern Ring |
Mahd Hospitality Company |
23/5/2009 |
The project of repairing industrial cracks, potholes and bumps of roads in the Industrial City of Riyadh |
Body industrial cities and technology zones |
1/8/2009 |
The project of implementing cleaning works for the residential area located in the industrial city of Riyadh |
Body industrial cities and technology zones |
13/1/2010 |
Asphalting and earthworks within the Fanar Industrial City power station, Contract No. 77-034 ) cd ) |
Al-Fanar Company |
7/2/2010 |
Executing some rehabilitation work, for example, but not limited to:Fencing and asphalting the police roundabout in the Second Industrial City in Riyadh and another |
Industrial Estates Authority |
2/5/2010 |
Pipe installation work (pvc) Diameter 8 inch |
Saline Water Conversion Corporation |
16/5/2010 |
Road works in the facilities of Fanar Industrial City, Contract No. ( cd77-042) |
Al-Fanar Company |
2/11/2010 |
|
|
|
Drilling and disposal of drilling materials at the King Abdullah Financial District site ( Hold number 13305 ) |
bin Ladin Saudi group |
21/11/2010 |
Road and asphalt works at King Saud University in Riyadh |
bin Ladin Saudi group |
2/1/2011 |
Earthworks project for Azizia land, old Kharj road |
Al-Fanar Company |
12/2/2011 |
Road cutting, leveling and transfer of waste at the King Abdullah Financial District site |
bin Ladin Saudi group |
21/4/2011 |
Road cutting, leveling, and waste transfer work at King Abdullah Financial District, Contract No. (13716 ) |
bin Ladin Saudi group |
16/11/2011 |
Digging works at King Abdullah Financial District, Contract No. ( 13755 ) |
bin Ladin Saudi group |
5/12/2011 |
Road works inside Al-Muhaidib land in Al-Sally neighborhood – Riyadh |
Abdul Qadir Al Muhaidib and Sons Company |
31/12/2011 |
Submit the classification and settlement of the substation for the power station project No. (12)The United League in Riyadh (Darma) |
Bimco Arabia Contracting Company |
10/11/2012 |
Excavation and filling works in the Al-Malqa project |
Ram Al-Mabani Contracting Company Ltd. |
24/4/2013 |
Filling works, SB layer, base layer material change, and SB layer in all works for North Riyadh Street asphalt project |
Roads Summit Contracting Est |
10/9/2013 |
Drilling works for the flood drainage project |
Tributaries Roads Contracting Est |
11/9/2013 |
Earthworks projects and hall No. (5) At King Khalid International Airport |
Elarrab Contracting Company |
15/2/2014 |
Earthworks for the asphalting project, south of Riyadh |
Al-Fawzani Company |
10/4/2014 |
Drilling works for the flood drainage project in southern Riyadh |
Al Namal Holding Company |
23/4/2014 |
Extension and expansion of the optical fiber network |
Etihad Mobily Communications Company |
|